When you’re building out a new office, it’s easy to focus on what people will see: the layout, the finishes, the furniture. But the cabling and WiFi behind the walls and above the ceiling will shape how your team works every single day.
The best time to plan that infrastructure is while the space is still open. Once the drywall goes up, every change gets harder, slower, and more expensive.
In a recent post, we covered when to bring a low voltage contractor into a build. This time, we’re looking at what to actually plan for, so your new space is ready to work from day one.
Network Drops: How Many and Where
A network drop is a wired connection point, usually a jack in the wall or floor. Even in a WiFi-heavy office, wired connections are still the most reliable option for many devices.
When planning drops, think about every place a device will plug in:
- Workstations. Plan for at least two drops per desk. It gives you room for a computer and a phone, or a spare for later.
- Printers and copiers. These are often moved late in a project, so confirm their locations early.
- Conference rooms. Displays, video conferencing equipment, and a table connection all need their own drops.
- Front desk and reception. Check-in systems, phones, and payment terminals add up quickly.
- Ceilings. Wireless access points and cameras usually connect through cabling run to the ceiling.
It’s almost always cheaper to add a few extra drops during the build than to add even one after the walls are closed. If you’re expecting to grow, plan for it now.
WiFi Coverage and Access Point Placement
Strong WiFi doesn’t come from one powerful router in the corner. It comes from access points placed throughout the space, each one wired back to the network.
A few things affect where those access points should go:
- Building materials. Concrete, brick, glass, and metal can all weaken a WiFi signal.
- Layout. Long hallways, private offices, and separate wings may each need their own coverage.
- How many people connect at once. A conference room or break area full of phones and laptops needs more capacity than a quiet hallway.
- Areas people forget. Warehouses, outdoor spaces, and back offices often end up as dead zones.
Planning access point locations during the build means each one gets a clean cable run to the ceiling. It also lets you think about guest WiFi early, so visitors stay on a separate network from your business systems.
The Network Closet
Every cable in your office runs back to one place: the network closet. It holds your network equipment, firewall, and often your phone system, and it’s one of the most overlooked rooms in a build.
When planning the closet, keep these in mind:
- Size. Leave room for equipment racks, cable management, and future growth. A closet that’s packed on day one will be a problem by year two.
- Location. A central spot helps keep cable runs within distance limits and makes the whole layout simpler.
- Power. Dedicated electrical circuits and space for a battery backup keep your network running through short outages.
- Cooling. Network equipment generates heat. Without airflow or cooling, it can overheat and fail early.
- Security. The closet should lock, and access should be limited to the people who need it.
A well-planned closet is easier to manage, easier to troubleshoot, and much less likely to turn into a tangled mess down the road.
Cameras and Access Control While Walls Are Open
Security systems are much easier to install when they’re part of the original plan. Cameras, door access readers, and alarm sensors all need cabling, and that cabling is far simpler to run before the walls and ceilings are finished.
During the build, it’s worth deciding:
- Where cameras need to see. Entrances, parking areas, loading docks, and the network closet itself are common priorities.
- Which doors need controlled access. Front doors, server rooms, and storage areas are typical starting points.
- Whether you’ll add more later. Running extra cable now for future cameras or readers costs far less than opening walls later.
Even if you’re not ready to install everything on day one, planning the cabling now keeps your options open.
Fitting It Into the Build Timeline
Cabling and WiFi work happens in stages, and each one lines up with a point in construction:
- Design. Review floor plans, decide on drops, access points, cameras, and the network closet location.
- Rough-in. Once framing is up and before drywall, cable is run through walls and ceilings.
- Trim-out. After walls are finished, jacks, faceplates, and mounting hardware are installed.
- Equipment and testing. Network equipment, access points, and cameras go in, and every connection is tested.
The key is coordinating with your general contractor so the low voltage team isn’t waiting on the build, or holding it up. Missing the rough-in window is one of the most common and costly mistakes in a new office project.
It’s also worth confirming your internet service early. Providers can take weeks to install a new line, and your network won’t do much without it.
Build It Right the First Time
The infrastructure behind your walls doesn’t get much attention, but it affects your team every day. Planning cabling, WiFi, and security during the build saves time, money, and frustration once you’re up and running.